Home

Products
Retailers
Accessories
In Depth info
Images
Video Clips
Testimonials
Spare parts
Users Manual

UV-26 battery pack assembly
Propeller and hub assembly
Burntester + Watt's Up

Contact

UV-26 battery pack assembly instructions




Parts: 2 x Genesis 26a/h batteries
Bulkhead assembly, ring spacer,
4 x 6mm S/S bolts, wiring harness.
Tools required:
1 x 7/16th wrench, 1 x 7/16 wrench or
adjustable
1 x 10mm socket driver







This is the alignment of the batteries
to the bulkhead.









Step 1:
remove nuts and washers from top bulkhead












2:
slide middle bulkhead up about 1/2"













3:
Slide battery in, making sure not to
damage wires.




NOTE position of battery to slot in
the lower spacer.






4:Replace top bolts loose















5:Slide in battery















6: Install spacer.
If it is tight, loosen threaded rod from
the bottom.












7: tighten top nuts,
being carefull not to over tighten.

















8: This is correct












9: this is over tightened, note
the top bulkhead is bowed.












10:attach positive leads, with the
thicker power lead contacting the
battery terminal











11: Do not over tighten,
a socket driver is all you need
not a wrench.











12: attach negative leads,
with the thicker power lead contacting
the battery terminal.











13: Now connect the junper cable,
positive to negavive between the 2
batteries











Finished!
It should look like this.












Submerge Scooters.    Jupiter, Florida USA.      Phone 561 747 3640       submerge@silent-submersion.com